Home National MEIL Achieves Breakthrough in Rishikesh Tunnel

MEIL Achieves Breakthrough in Rishikesh Tunnel

0
2

Hyderabad: Megha Engineering and Infrastructures Limited (MEIL) has achieved a breakthrough in the 6.59-km-long Tunnel-14 of the Rishikesh-Karnaprayag railway project, which improves rail connectivity for pilgrims visiting the Char Dham shrines of Badrinath, Kedarnath, Gangotri and Yamunotri in Uttarakhand.

The breakthrough connects two sections of the main tunnel excavated from the Sumerpur and Marora portals, covering 4.7 km and 1.79 km, respectively. The excavation was carried out amid difficult geological conditions and adverse weather in the Himalayan region.

The achievement underscores MEIL’s engineering capabilities and the determination of its workforce in overcoming challenging geological conditions and adverse weather in the Himalayan region.

One of the major engineering challenges involved excavating a 110-metre stretch of the triple-track tunnel beneath inhabited areas in Sumerpur. The stretch comprised loose soil with only 20 to 30 metres of soil and rock cover above the tunnel. Specialised techniques, including pre-excavation and multi-drifting, were adopted to ensure safe excavation and ground stability.

The railway project is expected to improve connectivity to remote hill regions of Uttarakhand, facilitate travel for local residents, promote pilgrimage tourism, strengthen regional trade and generate employment opportunities.

Disclaimer : This story is auto aggregated by a computer programme and has not been created or edited by DOWNTHENEWS. Publisher: deccanchronicle.com